Sans Souci – transfer to Rostock

A successful 60,5nm transfer from the island of Rügen to Rostock Warnemünde. Sadly enough we had to motor it for around 8 hours, but then the wind freshened up. Enough to turn a 10 hour trip to 12 ½ hours with some more miles on the clock. In total 78nm.😃


A big thanks to Guido, Sebastian, Peter and Lukas for your continuous support 👍

All checked, new batteries installed
  • 2 x 160A (for the USB)  😉
  • 1 x reserve batterie for the radio

Heating in each cabin and saloon

The rig was checked during a 2 hour sail and found to be in excellent condition.

Klar zum ablegen
  Fill her up please Vor der Überführung von achtern
Passing the island

“Hiddensee” – still no wind

Crew Überführung
but that changed, slowly but surely 😎 Schmetterling
Didn’t I promise you guys that: Wind! 😀  IMG_2765
After a little diversion and crossing the main ship channel into the “Alten Strom”, to bring Guido to his car:

Entry into the Marina Hohe Duene, Warnemuende. Her home base for this season.

Kurz vor Sonnenuntergang eingelaufen

About Author

client-photo-1
Moderator